Negotiable
The date of payment from buyers deliver within days
Beijing
Long-term effective
2017-11-04 09:16
260
Company Profile
By certification [File Integrity]
Contact: kaijisuliao(Mr.)
Email:
Telephone:
Phone:
Area: Beijing
address: No.10, Tangxi Road, North Development Zone Of Huangyan, Taizhou City 318020, Zhejiang Province, China
Website: http://www.fitting-moulds.com/ http://kaijisuliao.wencaihaocai.com/
Specifications of reducing Tee pipe fittng mould
UPVC pipe fitting mould |
|
Mould material |
|
LKM, HASCO, KAIJI STANDARD |
|
Design software |
CAD, CAM, CAE |
Plastic material |
UPVC |
Delivery time |
30-60 days |
Packing |
Wooden case |
Mould quality control
For the Q/C of mold, there are 3 steps:
1.Mould Material Q/C
- Mould Steel Checking(Hardness, flaw detection)
- Mould Standard Spare Parts Checking(hardness, size, flaw checking)
2.Mould Making Process Q/C
- design checking (part design, mould design, mould engineering drawing)
- Each part of mould’s size checking after machining according to 2D drawing
- mould testing(check mould running condition)
3.check with customer’s requirement again before mold shipping.
Mould maintenance
a)When the mould is vacant, spray the anti-rust oil
b)To clean the gate and cooling system regularly
c)Avoid to use recycled material if the mould is suitable for virgin material only
After-Sale Service
a)Engineering and one interpreter can be sent to customer’s factory for first running.
b)one-year after-sale technique support
